The present project proposal envisages implementation of geoprotective measures and activities in landslide SFO 43.65869-01, Staro Selo quarter, Svoge, located in the northwestern part of the town, on a slope with landslide morphology and an area of 55 ha. with a found process of "creeping", as a result of which retaining walls, residential and farm buildings, street lanes were deformed. Based on the engineering-geological and hydrogeological studies of the terrain, the implementation of fortification measures is envisaged in three stages: stage I, stage II and stage III. The linear fortifications in the area of the lowest step (stage II) are financed under this procedure and amount to 6 799 972,80. The financing of the other fortification activities for stage I and stage III, as well as the implementation of construction, author's supervision for them and design by parts: Road, Temporary traffic organization, Permanent traffic organization, Fire Safety, Safety and health plan and Waste management plan will be provided by RIA. An agreement on co-financing in the amount of BGN 35 686 247.42 VAT incl. was signed between the Municipality of Svoge and the RIA with VAT on the site: “Strengthening of a landslide in Staro Selo”, Svoge with identification Nr. SFO 43.65869-01 concerning part of the republican road III-164 Svoge-Iskrets-Buchin prohod, Nr.08-00-1615 dated 29.11.2019. The implementation of the fortification measures and activities developed in the technical design for the three stages will lead to the overall stability of the landslide zone. The construction of a control and measuring system for geodetic monitoring of deformations will ensure effective planning of future strengthening measures. The implementation of these investments will contribute to reducing the number of people at risk of landslides and improving the fight against disasters, in line with the overall purpose of the procedure.
Overview
Status | In execution (temporary suspended) |
---|---|
Start date | 17 Jun, 2020 |
End date | 17 Nov, 2022 |
Contract date | 02 Jun, 2020 |
Programme
Beneficiary
Financial information
Total cost | 35,742,647.42 |
---|---|
Grant | 6,799,972.80 |
Self finance | 28,942,674.62 |
Total paid | 530,039.46 |
EU participation percent | 85.0% |
Location