The project proposal consists in the reinforcement of the dam and its facilities. The envisaged construction activities will be carried out in the Djelepska river bed in the area of the dam wall of the dam lake "Haidushko kladenche". The section of construction length and width of 150 m in the area of the wall and 500 m along the river for clearing of shrubs and trees - at a distance of 200 m after the end of the regulation of the village along the river. Activities will include the following: • Restoration of the air drain on the wall • Expansion and cladding of the power pack and the rapid flow with geoclates • Strengthening the energy-saving bed of the dam with crushed stone grids • Construction of the outlet shaft of the main drain and power after it • Restoration of a drainage gorge along the wall of the dam and its consolidation • Removal of construction waste • Cutting of bushes and felling of trees, removing roots - in an area of 500 m after the wall, the entire length of the corrected area • Aligning the river's terrace - along the entire length of the 500-meter section after the clearing river.
Overview
Status | Closed (completion date) |
---|---|
Start date | 13 Feb, 2019 |
End date | 13 Jul, 2021 |
Contract date | 13 Feb, 2019 |
Programme
Beneficiary
Financial information
Total cost | 998,963.08 |
---|---|
Grant | 998,963.08 |
Self finance | 0.00 |
Total paid | 715,596.77 |
EU participation percent | 85.0% |
Location