The aim of the project proposal is to improve the quality of the ambient air in the Municipality of Vratsa by reducing the levels of fine particulate matter and nitrogen oxides as a result of the replacement and modernization of the rolling stock of the means of mass urban transport. The implementation of the project will contribute to meeting the needs of the population, tourists and guests, companies and organizations in the municipality of Vratsa, fresh air, modern and ecological urban transport. It is planned to supply 13 new electric buses and 9 new trolleybuses meeting the European emission standards for engines and the use of renewable energy sources in public transport. Supply of specialized equipment for optimizing the operation of trolley buses and installation of charging stations for charging the electric motors is envisaged. The project includes activities for the supply of electric vehicles; specialized services; optimizing the operation of newly acquired vehicles, incl. implementation of an integrated transport management system (for electronic and real-time passenger information), collision avoidance systems, reconstruction of the contact network, construction of cable routes to charging stations and delivery and installation of rectifier station cartridges, initial registration and insurance, publicity measures. Activities have been developed following a cost-benefit analysis that has demonstrated the relevance of the project and the sustainability of the results. Expected results are reduction of PMI, noise and vibration levels and energy saving, reduction of use of non-renewable energy sources such as diesel and its replacement with electricity, development of sustainable urban transport, reduction of the use of private cars, increase of the share of urban transport users who, through the project, become attractive, comfortable and secure.
Overview
Status | In execution (starting date) |
---|---|
Start date | 05 Nov, 2019 |
End date | 05 Oct, 2022 |
Contract date | 21 Oct, 2019 |
Programme
Beneficiary
Financial information
Total cost | 32,027,089.53 |
---|---|
Grant | 26,000,000.00 |
Self finance | 6,027,089.53 |
Total paid | 13,729,956.28 |
EU participation percent | 85.0% |
Location