The project includes the purchase of 5electric buses with charging stations and additional equipment for servicing line No16, which is incl. in the control system, ticket and information systems, constructed under the pr."Integrated urban transport of the town of Pernik", as equipment it is also provided for buses on line16. Cable routes will be constructed for the charging of the charg.stations and a covered hall for the stay and loading of el.buses at the depot in the Church distr., Act 9907/2015. The main activities are: Preparation of the project proposal, including preparation of Cost Benefit Analysis; Delivery of 5pcs. New electric single buses not exceed 12000mm ± 200mm in length and their accessories thereto, incl.5pcs.slow and 1pc.dual fast charg. stations; Engineering (design, supervision and execution of construction and assembly activities) for the construction of cable trays for the charging of charging stations and the covered hall for the stay and loading of electric buses; Initial registration and insurance of the new rolling stock; Supervision during construction; Organization, management and measures for information and communication of the project; Financial audit-underperformance. The implementation of the project will achieve the needs of the target groups - the population in the town of Pernik-70 888 people - NSI data); tourists and guests of Pernik; companies and organizations active in the territory of Pernik; improving air quality by reducing emissions of PM10 and NOx from public transport with 0.08 t per year; creating more efficient and environmentally friendly public transport with less energy consumption and opportunities for alternative modes of transport; contribution to the achievement of the Specific objective "Reduction of atmospheric air pollution by reducing the amounts of PM10/NOx" under Priority Axis 5 of OPE 2014-2020. The project builds on the project "Integrated urban transport of the town of Pernik" under OPRD 2014-2020.
Overview
Status | In execution (temporary suspended) |
---|---|
Start date | 07 May, 2020 |
End date | 07 Oct, 2022 |
Contract date | 22 Apr, 2020 |
Programme
Beneficiary
Financial information
Total cost | 7,184,970.00 |
---|---|
Grant | 5,999,600.00 |
Self finance | 1,185,370.00 |
Total paid | 2,283,600.00 |
EU participation percent | 85.0% |
Location