Restoration and renovation of Borisova gradina - historical part

The project proposal - the renovation of zones and characteristic elements in Borisova Garden Park - part of a reserve of garden art, proclaimed by order of the Council of Ministers 19/08.12.88, SG No. 96/1988. It includes the implementation of construction for renovation of zones and characteristic elements of the park "Borisova Garden - historical part": Phase I “Renovation of alley network and park elements”: - Renovation of alley network; - Repair and expansion of park lighting along other unlit alleys, incl. construction of cable network, shafts and installation of new luminaires; - Reconstruction of the water supply and sewerage; - Construction of CCTV in the uncovered parts of the park - installation of new cameras and renovation of existing CCTV with modern equipment. - Restoration of symbolic places in the park: the lake with the lilies and the space around it, the lake with the ducks, the alpineum with the water area; a nr. of park elements – taps, sculptural decorations and figures in their authentic form: the fountain with a bear and penguins, the fountain with the monkey, the figure of a girl, the Orpheus plastic at the summer stage, the sculptural decoration - cranes on the island in the lake with the waterflow, the lion-shaped spouts in the water area behind the Bratska mogila, the goat in the playground. The implementation of the sculptural figures themselves is separated, outside the scope of the project proposal (in ph. III) and will be financed from the municipal budget. - Renovation of park furniture – benches, bins, signs and information boards, gazebos, and pergolas. - Preparatory, restoration and landscaping activities, including grass reconstruction, introduction of humus and enriched soil substrate, planting of shrubs and trees. Phase II includes the reconstruction of the existing public toilet at the Summer Reading Room and includes restoration of the existing toilet building while maintaining its volume-spatial parameters.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 05 Apr, 2021
End date 05 Oct, 2023
Contract date 05 Apr, 2021
View in UMIS

Financial information

Total cost 10,324,080.33
Grant 8,999,584.33
Self finance 1,324,496.00
Total paid 0.00
EU participation percent 85.0%

Location

Sofia Cap.