Energy efficient renovation in the building of territorial unit of Fire Safety and Protection of the Population, Burgas

The project proposal is aimed at increasing the energy efficiency and achieving the energy consumption class "B" in two buildings with administrative use of "Fire and Emergency Services" in Burgas. The planned activities include introducing energy saving measures on building surrounding elements and installations, improving the performance of the building and providing an accessible environment for disadvantaged people. The project proposal addresses three key aspects of - reduction of energy consumption and costs in two administrative buildings; providing better working conditions for employees; ensuring equal access for people with disabilities. The project target groups are 143 employees and over 8,000 citizens / per year, visitors and users of administrative services provided by the institution. The implementation of energy saving measures for building surrounding elements, microclimate maintenance systems in buildings and measures to improve accessibility for disabled people to Building 1, where administrative services are carried out, is envisaged. The expected results from the introduction of energy efficiency measures are: The energy consumption class of both buildings will increase from "E" (for building 1) and "F" (building 2) to "B"; Saving a total of 566071 kWh / y of primary energy, which represents 63.42% of energy saved (Building 1) and 69.50% of Energy Savings for Building 2 The ecological equivalent of the integrated implementation of all energy saving measures is 121.34 t / y. saved CO2 emissions. Improving the comfort of the working and visiting the administrative buildings and achieving environmental parameters which are set in the legislation Optimizing budget expenditures as a result of the achieved energy savings from the implemented energy efficiency measures. Reducing carbon emissions from public infrastructure. Improving performance to lengthen the lifecycle of the building.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 11 Mar, 2020
End date 11 Mar, 2022
Contract date 11 Mar, 2020
View in UMIS

Financial information

Total cost 521,030.92
Grant 497,214.12
Self finance 23,816.80
Total paid 397,771.30
EU participation percent 85.0%