Renovation and implementation of energy efficiency measures in the building of the TD of NRA-Burgas (5B, Tsar Petar str.)

The project proposal is aimed at increasing the energy efficiency and achieving the energy consumption class "B" in a building of Territorial Directorate of the National Revenue Agency located at 5B, Tsar Petar str. The planned activities include the introduction of energy saving measures on building envelope elements and installations and providing an accessible environment for disadvantaged people. The project proposal addresses three main aspects of the needs related to the reduction of the final energy consumption in the building ; improving the comfort of living and providing better working conditions for employees; ensuring equal access and social inclusion of people with disabilities. The target groups of the project are 337 permanent employees, over 40 average daily visitors (10 000 per year) in the building of Territorial Directorate of the National Revenue Agency wishing to consult or whose visits are related to the activity of the National Revenue Agency. As a result of the implementation of the energy efficiency measures in the administrative building, it will contribute to: √ The class of energy consumption of the building will rise from "D" to "B"; √ Saving of 665 872 kWh/y. primary energy equivalent to 43,54%; √ The ecological equivalent of the integrated implementation of all energy saving measures is 168.16 t./y. saved CO2 emissions; √ Improving the comfort of the people working and visiting the public building and achieving the normative parameters of the heating and lighting environment; √ Optimization of the budget expenditures as a result of the achieved energy savings from the implemented energy efficiency measures; √ Reducing carbon emissions from public infrastructure; √ Improved performance for extending the lifetime of a building; √ Ensuring conditions of living environment in accordance with the criteria for sustainable development.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 02 Oct, 2020
End date 02 Oct, 2022
Contract date 02 Oct, 2020
View in UMIS

Financial information

Total cost 2,996,731.63
Grant 999,498.00
Self finance 1,997,233.63
Total paid 349,824.30
EU participation percent 85.0%

Location