Updating and implementation of energy efficiency measures in buildings of the Interior Ministry in the area of public functions in Pazardzhik

This project proposal envisages implementation of measures to increase the energy efficiency of objects: buildings of the Interior Ministry in the city. Pazardzhik, Saedinenie Sq. №3 include turn: RDMI - Pazardzhik, Pazardzhik and RUP- Corpus, with 10 office of this Study housing located in the northeastern part of the first floor are transferred management of the District and Regional Prosecutor Pazardzhik. Landed property with ID 55155.503.9 and has an area of ​​4425 square meters according Sketch N: 2804 / 11.03.2013g. SGKK issued by the city. Pazardzhik. The buildings are public property and are category IV .Vaz on the conclusions of the prepared technical passports, the buildings are not currently meet the requirements of Article 169 of the SPA. The project proposal includes the realization of envisaged in the technical passports measures including a complete roof repair / installation of waterproofing and thermal insulation of the roof, replacing the interior roof gutters and drains /; implementation of modern energy efficiency measures / replacement of windows, thermal insulation of envelope / in accordance with the Ordinance №7 of 2004. Energy efficiency sgradi.Pri repair and according to the intended use of the building will take measures to ensure the requirements of Regulation №4 from 01.07.2009. design, implementation and maintenance of buildings in accordance with the requirements for accessible environment for the population, including people with uvrezhdaniya.Podmyana of heating buildings. The implementation of the above measures will lead to the achievement of class "B" of the energy consumption of the buildings of the Interior Ministry, located on the square. The compound №3 in the city. Pazardzhik in accordance with the purposes of this procedure BG16RFOP001-1.013.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 03 May, 2017
End date 07 Jun, 2019
Contract date 03 May, 2017
View in UMIS

Financial information

Total cost 1,772,800.00
Grant 1,672,480.00
Self finance 100,320.00
Total paid 1,552,297.90
EU participation percent 85.0%

Location