The building of the Regional Office Fire Safety and Protection of Population-Provadia is a two-storey building, as subsequently built single storey extension on the east side. Since the introduction and operation is used for fire service. In terms of functionality, It is a mixed-use building for administrative and domestic purposes and a garage for fire equipment. The building has no heat supply built by an external heat source. There is a local heating system. Power is exercised by the low-voltage network to the relevant energy supplier to the region. The project proposes the introduction of energy saving measures as follows: replacement of windows, thermal insulation of external walls, thermal insulation of roofs, increasing the efficiency of the boiler and domestic heating installations, build a solar system for domestic hot water, increasing the efficiency of the illumination system. The proposed measures will lead to a class "C".
Overview
Status | Closed (completion date) |
---|---|
Start date | 04 Jan, 2017 |
End date | 31 Jul, 2019 |
Contract date | 04 Jan, 2017 |
Programme
Beneficiary
Financial information
Total cost | 148,393.86 |
---|---|
Grant | 138,393.86 |
Self finance | 10,000.00 |
Total paid | 114,354.71 |
EU participation percent | 85.0% |
Location