This project proposal "Implementation of energy efficiency measures in buildings of residential infrastructure of the town of Botevgrad., Stage I" is under Priority Axis 2, Support for energy efficiency support centers in adjacent areas of the Operational Programme ,,Regions in Growth”. Within the project, three buildings of housing infrastructure of the municipality of Botevgrad, after the general meeting of the condominium, energy efficiency measures will be taken. The necessary energy saving measures for each building are reflected in reports from energy efficiency audit, accompanied by a valid energy performance certificate made by licensed experts. The measures aim to increase the class of energy and - a large percentage of energy savings. All three multifamily buildings subject to intervention - Residential building "Hristo Botev", located on the boulevard. "Treti Mart" № 81 residential block, located in bc "Vasil Levski", bl. 51 ent. And residential block, located on the street. "Stefan Karadja" № 4 are in poor technical condition. For the successful implementation of the project beneficiary - Botevgrad Municipality will hold procedures as required by the PPA for selection of contractors for the project activities, will participate with its representatives in the project team and will oversee the strict implementation of the planned activities. As a result of the project region consists of the municipality in three multifamily buildings in the town of Botevgrad. -will Create better living conditions for the citizens of the town. Botevgrad. The buildings reconstructed and renovated to meet modern requirements for residential buildings.
Overview
Status | Closed (completion date) |
---|---|
Start date | 01 Sep, 2016 |
End date | 30 Oct, 2019 |
Contract date | 01 Sep, 2016 |
Programme
Beneficiary
Financial information
Total cost | 806,796.71 |
---|---|
Grant | 806,796.71 |
Self finance | 0.00 |
Total paid | 738,415.75 |
EU participation percent | 85.0% |
Location