"Renovation and implementation of energy efficiency measures in the building of Primary school" Vasil Levski ", Kozloduy; the canteen of Secondary school "Hristo Botev", Kozloduy and the building of the United Children's Complex, Kozloduy "

The project proposal envisages the realization of energy efficiency measures and structural reinforcement in three public buildings of educational infrastructure in the city Kozloduy. Objects, subject to intervention, are: the building of Elementary School "Vasil Levski" in Kozloduy; the canteen of Secondary School "Hristo Botev" in Kozloduy and the building of the United Children's Complex, Kozloduy. Energy costs represent a significant proportion of the budgets of these buildings, and this requires the implementation of activities in energy efficiency and introduction of energy-saving heating systems, lighting and more. The target groups of the project are 237 students and 30 pedagogical and non-pedagogical staff, working in the three public buildings. With the implementation of the project the goal is to increase the energy efficiency of public buildings; elimination of losses of electricity; reduction of harmful emissions into the atmosphere Expected results of the project: - Improving the comfort of living in public buildings and achieving the statutory parameters of the environment for heating and lighting; - Optimization of the budget expenditures as a result of the achieved energy savings of the implemented energy efficiency measures to statutory for prior periods; - Extended service life of public infrastructure and their installations and facilities; - Reducing carbon emissions from public infrastructure. The main project activities are: Engineering (design, with supervision and construction); Construction supervision; Organization and management of the project; Publicity and visualization; audit.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Sep, 2016
End date 22 Mar, 2019
Contract date 09 Sep, 2016
View in UMIS

Financial information

Total cost 835,039.52
Grant 805,039.52
Self finance 30,000.00
Total paid 711,693.34
EU participation percent 85.0%

Location