The building of the Regional Office and Fire Safety and Protection of Population was put into operation in 2008. Due to the long lifetime as a result of natural wear and tear of materials performance of the building are significantly understated. The windows and doors are PVC double glazed, but there are other not changed metal garage doors. At the current moment, heating the building with boiler fuel oil with internal heaters and pipes of metal pipes. The building does not meet modern requirements for energy efficiency in buildings. In the present state - normalized energy consumption. in the building is 260 120.00 kWh / y, and the building falls within the class of energy consumption D of scale of energy consumption . In the implementation of all proposed energy saving measures , the total gross annual energy consumption will be reduced by 36 % to 186 326.00 kWh / y and the building will fall in class B of the scale of energy consumption .The proposed package of energy conservation measures will result in a significant environmental effect , carbon dioxide emissions will be reduced by 16.4 tons / year . The implementation of the planned energy saving measures will significantly improve the comfort of the Fire station employees and will increase their response in case of a fire or natural disaster.
Overview
Status | Closed (completion date) |
---|---|
Start date | 16 Sep, 2016 |
End date | 12 Apr, 2018 |
Contract date | 16 Sep, 2016 |
Programme
Beneficiary
Financial information
Total cost | 95,945.56 |
---|---|
Grant | 95,945.56 |
Self finance | 0.00 |
Total paid | 87,151.45 |
EU participation percent | 85.0% |
Location