"Implementation of energy renovation measures of public buildings in the town of Mezdra - social services entity

The building, site of the project proposal was built in 1974. Because of the long lifetime as a result of natural wear and tear of materials performance of the building are significantly understated. Aluminum in extremely poor condition. Exceptions are some windows on the third floor, which were replaced with PVC, but have not taken measures lagging the other surrounding elements seen floor, walls and roof. Heating the building with gas boiler with internal heaters and trays of metal pipes without insulation.The building does not meet modern requirements for energy efficiency in buildings. In the present state - normalized energy consumption in the building 797587 kWh / y, and the building falls within the class of energy consumption D of scale of energy consumption . In the implementation of all proposed energy saving measures , the total gross annual energy consumption will be reduced by 50.01% to 397997 kWh/y and the building will fall in class B of the scale of energy consumption .The proposed package of energy conservation measures will result in a significant environmental effect , carbon dioxide emissions will be reduced by 77.9 tons/year . The implementation of the planned energy saving measures will significantly improve the comfort of the employees of the administration and visibly reduce operational expenditure.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 16 Sep, 2016
End date 11 Jun, 2018
Contract date 16 Sep, 2016
View in UMIS

Financial information

Total cost 312,749.99
Grant 272,545.22
Self finance 40,204.77
Total paid 258,491.22
EU participation percent 85.0%