The building, site of the project proposal was built in 1974. Because of the long lifetime as a result of natural wear and tear of materials performance of the building are significantly understated. Aluminum in extremely poor condition. Exceptions are some windows on the third floor, which were replaced with PVC, but have not taken measures lagging the other surrounding elements seen floor, walls and roof. Heating the building with gas boiler with internal heaters and trays of metal pipes without insulation.The building does not meet modern requirements for energy efficiency in buildings. In the present state - normalized energy consumption in the building 797587 kWh / y, and the building falls within the class of energy consumption D of scale of energy consumption . In the implementation of all proposed energy saving measures , the total gross annual energy consumption will be reduced by 50.01% to 397997 kWh/y and the building will fall in class B of the scale of energy consumption .The proposed package of energy conservation measures will result in a significant environmental effect , carbon dioxide emissions will be reduced by 77.9 tons/year . The implementation of the planned energy saving measures will significantly improve the comfort of the employees of the administration and visibly reduce operational expenditure.
Overview
Status | Closed (completion date) |
---|---|
Start date | 16 Sep, 2016 |
End date | 11 Jun, 2018 |
Contract date | 16 Sep, 2016 |
Programme
Beneficiary
Financial information
Total cost | 312,749.99 |
---|---|
Grant | 272,545.22 |
Self finance | 40,204.77 |
Total paid | 258,491.22 |
EU participation percent | 85.0% |
Location