With the project proposal aims to update the administrative building of the municipal administration, through the implementation of energy efficiency measures that are prescribed as mandatory in the building energy audit and activities constructive restoration, prescribed as mandatory in the technical inspection. Will be fulfilled and associated works related to the implementation of energy efficiency measures and restoration of the original condition impaired due to renovation. With the implementation of the activities will extend the life of the building and reduce maintenance costs, thereby improving working conditions and providing services to the population. City Hall is centrally located and framing the eastern part of the town square. According to the regulation plan of the town. Nikopol building is located in Building I, sq. 24 with ID 51723.500.19 the cadastral map of the city. Nikopol. The building was built and put into operation in 1969. A three-storey building with basement and attic, built with skeletal concrete construction and the sloping wooden roof. As a function is an administrative building. The first three floors is situated administration management with service rooms and bathrooms. The attic floor is not operated and maintained. Under the building is built basement with storage and utility rooms and 3 pcs. garages, which are accessible via ramps on the east side of the building. The site is designed and built solid with concrete construction scaffolding. The surrounding walls / internal and external / are brickwork. The building of the municipal administrations is the only city that provides administrative services. After an analysis it is found that the building which houses the municipal administration g. Nikopol has the greatest need of renovation and potential energy savings.
Overview
Status | Closed (completion date) |
---|---|
Start date | 10 Sep, 2016 |
End date | 17 Oct, 2018 |
Contract date | 10 Sep, 2016 |
Programme
Beneficiary
Financial information
Total cost | 727,250.51 |
---|---|
Grant | 727,250.51 |
Self finance | 0.00 |
Total paid | 691,575.84 |
EU participation percent | 85.0% |
Location