Improved energy efficiency of residential buildings in the town of Peshtera - LOT 2

The current project proposal envisages implementation of measures for increased energy efficiency of the following residential buildings in the town of Peshtera: 1. 3, Peter Gruncharov Str. 2. 2, Starata Krepost Str. 3. Apostolovi and Shopovi, 35, D-r Peter Cikalov Str. 4. 1 and 1A, Prof. Yanko Todorov Str. 5. Lachevi, 41a, Simon Nalbant Str. 6. Stamenovi, 34, Simon Nalbant Str. 7. 128, Mihail Takev Str. 8. 15, St. Konstantin Str. 9. Dimovi, 6, Prof. Yanko Todorov Str. 10.Victoria, 6-6a, St.Kontantin Str. Based on the conclusions of the technical passport, the buildings’ current status do not meet the requirements of Art. 169 of the LTD in terms of energy efficiency, safe operation, noise protection and environmental protection. Compared to the other residential buildings, the a.m. sites reveal high level of project preparation, necessity for renovation and energy savings potential. The project proposal envisages the following measures set in the Technical Passports: • Provision of the requirements for accessible environment for the population, incl. people with disabilities. • Complete isolation according to Ordinance Nr.7 from 2004 for Energy efficiency in buildings. • Replacement of windows casings acc. to Ordinance Nr.7 2004. • Heating systems replacement. • Roof thermal insulation, replacement of construction and waterproof layers. • Replacement of rain gutters and water spouts. • Recovery of compromised plaster on walls and ceilings and application of finish latex or oil paint. • Necessary measures – water supply and drainage system. • Necessary measures - electrical system. • Necessary measures - fire safety system. • Renovation of unrepaired premises in the building in order to ensure better sanitary measures. The implementation of the a.m. measures will lead to the achievement of class „B and C“ energy consumption, in compliance with the goals of the current procedure

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 12 Oct, 2016
End date 19 Aug, 2020
Contract date 12 Oct, 2016
View in UMIS

Financial information

Total cost 772,030.16
Grant 772,030.16
Self finance 0.00
Total paid 663,867.41
EU participation percent 85.0%

Location