Improved energy efficiency of residential buildings in the town of Peshtera - LOT 5

The current project proposal envisages the implementation of measures for increased energy efficiency of the below stated residential buildings - private property. The sites comprising of separate premises, are located in the town of Peshtera at the following addresses: 1. Hubav dom, 5, Nikola Donski Str., 2. 23, Angel Kaloyanov Str., 3. 47 and 47a, Yordan Kovachev Str. , 4. 23, Yordan Kovachev Str. 5. 14, Vlado Rachev Str., 6.8, Ivan Tzveev Str., 7. Popovi houses, 4, Hristo Smirnenski Str., 8. Filipovi, 24, Vasil Levski Str., 9. Kamboyanovi Houses, 4, Mihail Takev Str., 10. 31, Veselin Staykov Str., 11. 7 and 7a, Kosta Gyoshev Str., Based on the conclusions of the technical passport, the buildings’ current status do not meet the requirements of Art. 169 of the LTD in terms of energy efficiency, safe operation, noise protection and environmental protection. Compared to the other residential buildings, the a.m. sites reveal high level of project preparation, necessity for renovation and energy savings potential. The project proposal envisages the following measures set in the Technical Passports: • Complete isolation according to Ordinance Nr.7 from 2004 for Energy efficiency in buildings. • Replacement of windows casings acc. to Ordinance Nr.7 2004. • Heating systems replacement. • Roof thermal insulation, replacement of construction and waterproof layers. • Recovery of compromised plaster on walls and ceilings and application of finish latex or oil paint. • Necessary measures – water supply and drainage system. • Necessary measures - electrical system. • Necessary measures - fire safety system. • Recommendation measures specific for each site. The implementation of the a.m. measures will lead to the achievement of class „B and C“ energy consumption, in compliance with the goals of the current procedure.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 13 Oct, 2016
End date 09 Sep, 2020
Contract date 13 Oct, 2016
View in UMIS

Financial information

Total cost 894,856.35
Grant 894,856.35
Self finance 0.00
Total paid 763,910.33
EU participation percent 85.0%

Location