"Regions in the updated housing growth in Nikopol"

With a project proposal aimed renovation of three multifamily buildings in the city of Nikopol, through energy efficiency measures that are prescribed as mandatory for buildings in the energy audit and activities constructive restoration, prescribed as mandatory in the technical inspection. Will be implemented and associated works related to the implementation of energy efficiency measures and restoration of the original state, impaired due to renovation. With the implementation of the activities will extend the life of buildings and reduce maintenance costs, thereby improving the living conditions of the population, thermal comfort and higher quality of living environment. Subject to intervention are building three multi-family residential units. For realization of the projects have been approved Applications for interest and financial assistance and contracts for upgrading the energy efficiency of buildings within the project for energy efficiency of residential buildings in procedure BG16RFOP001-2.001 "Energy efficiency in peripheral areas" of OPRD 2014-2020 , with the associations of condominium owners. Multifamily residential town represented by "Nikopol Alexander Stamboliyski 1", located in the town of Nikopol, street "Alexander Stamboliyski" № 1, built in 1964. The block has four floors with two entrances and 16 apartments with total area 2142.12 square meters Multifamily residential town represented by "Nikopol Vasil Levski 87" is located in the town of Nikopol, street "Vasil Levski" №87, built in 1986 and built up area 2732.10 sq.m, 5 floors with two entrances and 30 apartments. Multifamily residential town represented by "Nikopol Vasil Levski 107" is located in the town of Nikopol, street "Vasil Levski" № 107, a panel of five floors with two entrances and 28 apartments with a total floor area of 2707.72 square meters built in 1984.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 18 Nov, 2016
End date 16 Jul, 2019
Contract date 18 Nov, 2016
View in UMIS

Financial information

Total cost 1,171,730.41
Grant 1,171,730.41
Self finance 0.00
Total paid 1,026,508.66
EU participation percent 85.0%

Location