"Regions in Growth updated their homes in the town of Nikopol"

With a project proposal aimed renovation of three multifamily buildings in the city of Nikopol, through energy efficiency measures that are prescribed as mandatory for buildings in the energy audit and activities constructive restoration, prescribed as mandatory in the technical inspection. Will be implemented and associated works related to the implementation of energy efficiency measures and restoration of the original state, impaired due to renovation. With the implementation of the activities will extend the life of buildings and reduce maintenance costs, thereby improving the living conditions of the population, thermal comfort and higher quality of living environment. Subject to intervention are building three multi-family residential units. For realization of the projects have been approved Applications for interest and financial assistance and contracts for upgrading the energy efficiency of buildings within the project procedure BG16RFOP001-2.001 "Energy efficiency in peripheral areas" of OPRD 2014-2020 with the associations of owners a condominium. Subject to intervention are three buildings: 1.Mnogofamilna residential town represented by "Nikopol Rakovska 10", located in the town of Nikopol, "Rakovski" №10, built in 1974. The block has five floors with one entrance, 20 suites, 1 garage and three commercial sites, with total area 1826.70 square meters 2.Mnogofamilna residential town represented by "Nikopol Rakovska 16" is located in the town of Nikopol, "Rakovski" №16, built in 1974, 5 floors with one entrance, number 20 apartments, 4 garages and 1 business site with built-up area of ​​1826.70 sq.m.  3.Mnogofamilna residential town represented by "Nikopol Europe 13", located in the town of Nikopol Square. "Europe" №13, built in 1974, on five floors, with an input of 20 apartments and 5 commercial sites with total floor area of ​​1723.80 square meters

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 26 Sep, 2016
End date 07 Jun, 2019
Contract date 26 Sep, 2016
View in UMIS

Financial information

Total cost 950,785.78
Grant 950,785.78
Self finance 0.00
Total paid 814,476.09
EU participation percent 85.0%

Location