Implementation of energy efficiency measures in multifamily residential buildings in the town of Botevgrad - Stage 4

The current project “Introduction of energy efficiency measures in buildings from the residential infrastructure of town of Botevgrad, Stage IV” is under PA 2 “Support for energy efficiency in support centers in outlying areas” of OP ”Regions in growth”. Within the project for five buildings from the residential infrastructure of Municipality of Botevgrad with decision of the general meeting of the condominium ownership will be taken and implemented measures to increase energy efficiency and measures to improve access for people with disabilities, in accordance with the requirements of Ordinance №4/01.07.2009. The necessary energy saving measures for each building are reflected in reports from energy efficiency audits, accompanied by a valid energy performance certificate made by person licensed for this purpose. The measures aim to increase the class of energy consumption, to increase energy savings and to ensure an accessible environment. All the five multifamily residential buildings (RB), subject of intervention, are in a poor technical condition - RB “Orhanie”, located in housing estate “Vasil Levski, bl.1, RB “Harmoniya”, located on 3 “Vasil Levski”Str., RB “Bozhenishki urvich2”, located on 2 “Bozhenishki urvich”Str., entrances 1, 2, 3 and RB “Druzhba”, located on 16 “Bulgaria”blvd. For the successful implementation of the project the Beneficiary will carry out public procurement procedures in accordance with the Public Procurement Act for selection of contractors for the project activities. The Beneficiary will participate with its representatives in the project team and will monitor the strict implementation of the envisaged activities. As a result from the project implementation on the territory of the Municipality in five multifamily buildings in town of Botevgrad will be created good living conditions for 121 inhabitants. The reconstructed and renovated buildings will meet the modern requirements.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 01 Nov, 2016
End date 07 Dec, 2020
Contract date 01 Nov, 2016
View in UMIS

Financial information

Total cost 1,057,537.80
Grant 1,057,537.80
Self finance 0.00
Total paid 986,432.95
EU participation percent 85.0%