Reconstruction, modernization and introduction of energy efficiency measures of industrialy built multifamily buildings in the city Cherven Bryag

The project proposal envisages the introduction of energy efficiency measures in industrially built multifamily buildings in the city Cherven bryag. The planned activities include introducing prescribed by the consultant performed an energy audit of the buildings energy-saving measures and implement those reflected in the technical passport guidelines and recommendations in order to reach at least class energy "C" in the buildings. Better performance of the buildings within the scope of intervention will significantly reduce operating costs for the buildings and will contribute to the extension of their life cycles. The project is aimed at implementing the following thematic objectives in accordance with the General Regulation №1303 / 2013: Thematic Objective 4 "Supporting the transition to a low-carbon economy in all sectors". Interventions within the project proposal will contribute to achieving the indicative national targets for energy savings in 2020 under the National Action Plan on Energy Efficiency 2014-2020 aiming By supporting adequately address the problems associated with the increased migration to major and medium-sized cities, better quality of life and the supply of cultural services and modernization of public infrastructure in the town of Cherven bryag and stimulate urban-rural connections .The activities for energy upgrade will extend the life of buildings, reduce maintenance costs and help reduce greenhouse gases will stimulate people to remain living in small settlements.

Comments
Leave a comment

Overview

Status Terminated (termination date)
Start date 10 Oct, 2016
End date 10 Apr, 2019
Contract date 10 Oct, 2016
View in UMIS

Financial information

Total cost 2,109,612.57
Grant 2,109,612.57
Self finance 0.00
Total paid 1,267,024.93
EU participation percent 85.0%

Location