"Implementation of energy efficiency measures and renovation of multifamily residential buildings–“Anjerovi”, “Darina”, “Iosif Kehaiov”, “Bochukovi-Zlatograd”, “Ariste”, “Spring” and blocks “White house” and №178, in the town of Zlatograd", with an acronym ZlatownEECO2 – 2.

The project proposal is aimed at increasing the energy efficiency and extending the life cycle of multifamily residential buildings in the town of Zlatograd. These are houses owned by owners‘ associations –“Anjerovi”, “Darina”, “Iosif Kehaiov”, “Bochukovi-Zlatograd”, “Ariste”, “Spring” and blocks “White house” and№ 178, in the town of Zlatograd ". At present, the dwellings in these buildings are energy inefficient, because most of them are heated on solid fuel.This is a prerequisite for air pollution in the town.Improving the energy efficiency of the buildings will contribute to improve air quality and quality of life in the town of Zlatograd, and will also contribute to improve the attractiveness of the town by improving the appearance of the buildings.The project includes buildings built in the 1960s, 70s and 80s, which have not been completely renovated since then. It is apparent from the energy and technical reports and technical projects that the eightbuildings need to introduce measures to increase energy efficiency and implementing measures for constructive strengthening to ensure an extension of the period of their use. At present, the eight buildings have a low energy consumption class "G", "F" and "E".The measures that are prescribed for achieving a higher energy class of the buildings are: thermal insulation of external walls, replacement of metal and wooden joinery with PVC joinery, with glazing, thermal insulation of roofs, replacement of lighting.To the buildings is intended to be provided an access for disadvantaged people. An economic activity is notoperated in the buildings, except for block 178, where there is an economic site.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 14 Mar, 2019
End date 14 Jul, 2021
Contract date 14 Mar, 2019
View in UMIS

Financial information

Total cost 1,098,045.31
Grant 1,098,045.31
Self finance 0.00
Total paid 622,296.53
EU participation percent 85.0%

Location