"Implementation of energy efficiency measures and renovation of multifamily residential buildings– “Saraliiski”, “Pehlivanovi”, “Hadjievi”, “Zumbul”, “Svatevi” and blocks № 190 and № 195A, in the town of Zlatograd ", with an acronym ZlatownEECO2 – 3.

The project proposal is aimed at increasing the energy efficiency and extending the life cycle of multifamily residential buildings in Zlatograd.These are houses owned by owners‘ associations –“Saraliiski”, “Pehlivanovi”, “Hadjievi”, “Zumbul”, “Svatevi”and blocks № 190 and № 195A, in the town of Zlatograd. At present, the dwellings in these buildings are energy inefficient, because most of them are heated on solid fuel.This is a prerequisite for air pollution in the town.Improving the energy efficiency of the buildings will contribute to improve air quality and quality of life in the town of Zlatograd, and will also contribute to improve the attractiveness of the town by improving the appearance of the buildings. Most of the buildings included in the project proposal were built in the 1960s. In the 1980s, some of them underwent reconstructions, they were upgraded, but none of the buildings were completely renovated. It is apparent from the energy and technical reports and technical projects that the eight buildings need to introduce measures to increase energy efficiency and constructive strengthening measures to ensure an extension of the period of theiruse and improved living conditions in them. At present, the buildings have a low energy consumption class "G", "F" and "E". The measures that are prescribed for achieving a higher energy class of the buildings are: thermal insulation of external walls, replacement of metal and wooden joinery with PVC joinery, with glazing, thermal insulation of roofs, thermal insulation of floor. To thebuildings is intended to be provided an access for disadvantaged people.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 14 Mar, 2019
End date 14 Jul, 2021
Contract date 14 Mar, 2019
View in UMIS

Financial information

Total cost 791,136.11
Grant 791,136.11
Self finance 0.00
Total paid 632,908.89
EU participation percent 85.0%

Location