Energy efficiency improvement of multifamily residential buildings in town of Troyan with addresses: 332nd Vasil Levski Str.; r.c. Mladost, res. bl 2; 7th Pencho Hadzhi Naydenov Str.; 105th 107th Hristo Botev Str. and 23rd Toma Hitrov Str.

The project proposal is aimed at energy efficiency improvement of four multifamily residential buildings in town of Troyan, as follows: - multifamily residential building with address 332nd Vasil Levski Str. with 46 individual residential sites; - multifamily residential building with address r.c. Mladost, res. bl 2 with 52 individual residential sites; - multifamily residential building with address 7th Pencho Hadzhi Naydenov Str. with 9 individual residential sites; - multifamily residential building with address 105th 107th Hristo Botev Str. and 23rd Toma Hitrov Str. with 8 individual residential sites. Within the project will be implemented: - all mandatory energy efficiency measures for the buildings as per the respective EE Surveys – thermal insulation of outer walls, floor and roof, replacement of facade windows, replacement of luminaires with energy-saving, as well as accompanying construction works; - construction restoration/reinforcement measures prescribed as mandatory in Construction Surveys of the buildings; - construction works related to repair of common parts of the buildings, achieving more than 60 % energy savings of primary energy; - lightning protection and grounding installation; - measures related to improved access for people with disabilities to the buildings. The planned project activities will contribute to improvement of energy and operating characteristics of residential buildings and to reduction of end energy consumption. Lower energy characteristics of buildings require undertaking of energy efficiency measures, even more their implementation leads to direct effect on reducing greenhouse emissions. Improved ecological indicators, as a result of the savings of harmful emissions in the atmosphere will directly and tangibly improve quality of life and environmental conditions in town of Troyan.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 03 Sep, 2020
End date 03 Sep, 2022
Contract date 03 Sep, 2020
View in UMIS

Financial information

Total cost 1,499,980.58
Grant 1,499,980.58
Self finance 0.00
Total paid 524,993.20
EU participation percent 85.0%

Location