Development of an Intelligent Refrigerated Shop Display

Brothers Chicheklievi Ltd. was founded 1996 and operates in two directions , the main design, production , installation and servicing of refrigeration and ventilation equipment , and the second started with the aim of completing the cycle of furniture and consists in the production of specialized furniture for shops, restaurants, and now furniture for the home. This project proposal is a continuation of the company's consistent efforts to develop and to offer on the market new products that will provide the enterprise with the much-needed competitive advantage both within the national market and the European market. The product innovation developed under the project is an Intelligent Refrigerated Shop Display. The device shall include all functions of standard refrigerated shop displays, with 3 additional features, which are entirely innovative. The main innovative function of the Intelligent Refrigerated Shop Display shall be its ability to measure, in real time, the product quantity (the product stored the most is ice cream) stored inside and the option to notify the owner in case this quantity of the stored product drops below a pre-set minimal value. Another innovative function of the Intelligent Refrigerated Shop Display will be the ability for preventive reaction in case low input voltage of the electricity supply is detected, in order to preserve the compressor from burning out. Also, the Intelligent Refrigerated Shop Display shall provide timely reaction in case of inability to reach the working temperature selected or very high condensing temperature., thus providing opportunity for prevention and minimization of the risk from turning food into inedible waste. The product developed under the project entirely falls within thematic area "mechatronics and clean technologies", priority direction "machine building and instrumentation, including parts, components and systems, with emphasis on transport and energy".

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 30 May, 2018
End date 18 Nov, 2020
Contract date 30 May, 2018
View in UMIS

Financial information

Total cost 636,912.00
Grant 499,766.80
Self finance 137,145.20
Total paid 449,737.09
EU participation percent 85.0%

Location