Increasing the competitiveness of "Artistiko" Ltd.

The successful implementation of the project will have a positive effect on the entire production process. After contractor selection, done according to Decree 118/2014, new high-performance machines for processing wood will be bought. These machines are needed to: increase production capacity, reduce waste, decrease energy consumption, increase the efficient use of resources, increase export potential and quality of products, to overcome technological limitations, so to create new end products with higher added value. 1. The machine for prints will introduce a variety of new types of flooring, which are new to "Artistiko" LTD and up to now are unknown in the Bulgarian market. 2. The new batch circular saw can cut 10,000 m2 plywood, compared to 3,000 m2, which is the capacity of the hand circular saw. 3. The multi-layered band-saw will facilitate the process by eliminating the “calibration” operation after cutting, which is currently mandatory. Production will be increased up to twice. 4. The bilateral glue-coating machine increases the capacity up to 10 times; it spreads the glue evenly and the adherence is of higher quality. 5. The calibration grinding allows perfect preparation for lacquering the floor and calibration the thickness of each floor-board, which is very important for obtaining a good fit of the individual boards. 6. The use of edging machine ensures that a perfect right angle of the parquet is obtained; the production capacity increases 3-4 times. 7. The automatic machine coating of oil on parquet and wooden flooring significantly reduces the consumption of the raw material used. 8. The machine for gouging of parquet and wooden flooring is used in the last stages of the production process to give a final look of the articles of this series of products. The new machines will allow "Artistiko" to produce a larger volume high quality production, to create new assortments and new jobs, and to increase the financial performance of the enterprise.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 23 Dec, 2015
End date 16 Feb, 2017
Contract date 23 Dec, 2015
View in UMIS

Beneficiary

Financial information

Total cost 1,196,640.00
Grant 717,984.00
Self finance 478,656.00
Total paid 717,984.00
EU participation percent 85.0%

Location