Improvement Of The Production Capacity in VIKTORIA-05 LTD

The Project Offer is focused on the improvement of the competitiveness of VIKTORIA-05 LTD - export oriented, dynamically developing medium enterprise from the production sector. It is experienced and with traditions in the production of energy saving and low-emission solid fuel heating appliances, designed for medium and high price segment households. The Product List covers wide product range with high added value: accuracy of the geometry, operation reliability, aesthetics development and superior design. Regardless the good market position and comparative advantages, the weak points are the restrictions of the production process, impeding the policy of product update and production of new high-tech and ecological product - pellet fireplaces and boilers with electronic control and automatic supply with maximal efficiency and minimal harmful emissions; that is why the market position of the Company is unfavorable with limited export capacities; it faces obstacles to utilize its experience and potential. The solution of these problems determines the needs of the Company to invest in a new state of the art equipment: The market situation as well as its established position, are the challenges, forcing the Company to continue the development of its current production activities and to increase its production capacity. This will be achieved through the offered project activities, which will be favorable to overcome the currently faced restrictions: 1 Improvement of the production processes 2. Adding new product characteristics 3. Improvement of variety of the product range 4; Improvement of the resource efficiency and efficacy of the production process, The expected specific results by the end of the third year after the project implementation are: Achievement of internal rate of return – 17.43%, increasing of the productivity – 15.40%, amendment of the average generated export incomes – 106.54%, increasing of the efficiency of the production costs – 16.07%.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Feb, 2016
End date 18 Oct, 2016
Contract date 09 Feb, 2016
View in UMIS

Financial information

Total cost 675,000.00
Grant 405,000.00
Self finance 270,000.00
Total paid 403,260.00
EU participation percent 85.0%

Location