The project proposal plans the execution of activities to help the development and the distribution to the market of a new product – Regenerator of work voltage and work phase. The regenerator is an integrated product that consist several pre-made modules and casing, which are delivered by external suppliers. The whole production cycle covers the delivery of the different modules, the connecting components and additional mounting details, the assembling activities, the final adjustments of the completed product. The Regenerator of the work voltage and work phase supplies the consumers with very stable parameters of the electrical energy by maintaining high coefficient of performance, uninterruptable working processes and very high quality of the electrical supply. The regenerator can be applied to all consumers that use 3-phase electrical supply. The regenerator will be produced with wide range of standardized powers up to 1000 kVA, by covering the most common power loads in the industrial systems and the buildings’ energy distribution and supply systems. The project proposal contains activities for: • delivery of necessary equipment /tangible fixed asset/ for the assembling, adjustment and testing of the products; • market survey for the product realization; • development of production scheme and organization of the manufacturing process by specially hired experts After the execution of the project the company will achieve the following results: • Provide on average 3,5 work places, including a person with permanently reduced working capacity • Net profits from direct sales in the third year after the project implementation 504 000 BGN • Expected annual profit 41 870 BGN
Overview
Status | Closed (completion date) |
---|---|
Start date | 15 Aug, 2019 |
End date | 19 Feb, 2021 |
Contract date | 15 Aug, 2019 |
Programme
Beneficiary
Financial information
Total cost | 220,271.00 |
---|---|
Grant | 176,216.80 |
Self finance | 44,054.20 |
Total paid | 154,113.99 |
EU participation percent | 85.0% |
Location