Implementation of the entrepreneurial idea of Viki Engineering 17 EOOD

The realization of the entrepreneurial idea of Viki Engineering 17 EOOD will be realized through the development and application of technologies in the field of complete automatization of the production processes in mechanical processing - cutting, drilling, milling etc. of metals, alloys and other materials, with the reason of marketing the following goods and services: - constructive developments in the field of construction, machine building and instrumentation; - production of elements for suspended ventilated facades, joinery, winter gardens and others; - mechanical machining of metal elements and parts for machine building and instrumentation / sheets, strips, profiles, bushes, etc. / The products offered on the market through the realization of the entrepreneurial idea will be innovative with good quality and low cost because the cutting and production will be fully automated,with minimal losses of raw materials and energy. The idea of the entrepreneur will be realized through: - Recruitment of highly educated and experienced specialists /designer, technologist and others / to develop, implement and market the goods and services subject to the entrepreneurial idea; - Purchasing an automated CNC for machining metals, their alloys and other materials; - purchase of an automated double-head saw with CNC control for precise cutting and cutting of aluminum profiles, etc. metals; - angle-rammed machine with CNC control for aluminum architectural and industrial profiles for machine building and instrumentation. - use / outsourcing / services to develop technology documentation for products that form an entrepreneurial idea. The goods and services offered will be of good quality in accord with all standards (BDS, EN) with low cost because they will be realized through new technological solutions and production equipment, which is new and is currently lacking in the market in the region and the surrounding area.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 06 Aug, 2019
End date 15 Dec, 2020
Contract date 06 Aug, 2019
View in UMIS

Financial information

Total cost 249,999.60
Grant 199,999.68
Self finance 49,999.92
Total paid 192,953.04
EU participation percent 85.0%

Location