Implementation of entrepreneurial idea of "NATIONAL LABORATORY EE" EOOD

The implementation of the entrepreneurial idea of "NATIONAL LABORATORY EE" Ltd. will be realized through: consultancy services, engineering design and testing of machines, equipment, technological processes, development and implementation of projects related to electrical engineering, electronics, safety equipment, energy efficiency, consumption testing, measurement, composing and control of the technical documentation. The company will offer the following services on the market: 1. Consulting activities and testing of electric boilers for the class of energy efficiency; 2. Consulting activities and testing of pressurized water containers; 3. Consulting services, design and testing of communication systems for cyber security; 4. Consulting services, design and testing of electrical and electronic equipment; 5. Consulting services, design, testing and implementation of new products and other services. The company will develop and implement innovative services needed for manufacturers in the country and in Europe by: 1. Hiring of a team of highly qualified specialists: * Technological Engineer, * Expert engineer, * Expert engineer - Constructor, * Operator stand and others 2. Purchase of the following FTA: 2.1. Combined test stand for energy efficiency (ηelecwh) and standing losses (S) of electric water heaters; 2.2. Communication and cyber security test stand; 2.3. Cycle test stand for water tanks; 2.4. Station for testing, development and repairing electronic equipment; 2.5. Compressor for compressed air. 3. Hire of production premises 4. Services: 4.1. Technologies development for providing services; 4.2. Creation of a candidate's website; 4.3. Protection of industrial property at national and international level and use of the necessary expert assistance; 4.4. Vizalization. The project will allow to be designed and tested electrical products to improve energy efficiency, cyber security and safety.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 14 Aug, 2019
End date 18 Nov, 2020
Contract date 14 Aug, 2019
View in UMIS

Financial information

Total cost 247,905.28
Grant 198,324.22
Self finance 49,581.06
Total paid 183,455.13
EU participation percent 85.0%

Location