Improvement of the production capacity and increase of the export potential of Bulmak 2005"" Ltd.

Bulmak 2005 Ltd. was established in 2005. The main activity of the company is the production of metal structures and equipment, repair and restoration activities in the shipbuilding and ship repair system / ship welding and hull works, ship metal facilities, installation and repair of heat energy facilities; repair, rehabilitation and installation of all kinds of facilities and installations in thermal power plants, heat insulation of pipelines; production, supply and installation of power equipment. The production base of the company is positioned in the village of Ezerovo-Beloslav municipality, with 10 work places: production department - "Mechanical Processing"; production workshop - "Production of sheet material"; production department "Manufacture of profiled metal"; production workshop - "Blasting and painting"; repair rooms; carpentry and car workshop; external and internal warehouses for unprocessed metal and finished products. In connection with the planned expansion of the activity as a result of the increased demand for the manufactured products, Bulmak2005 EOOD needs additional purchase of a CNC cutting machine which will enable the cutting process to be plasma and / or gas-oxygen. This type of machine is most suitable for laden industrial production such as Bulmac 2005 EOOD. In connection with the planned expansion of the activity as a result of the increased demand for the manufactured products, Bulmak2005 EOOD needs additional purchase of a CNC cutting machine which will enable the cutting process to be plasma and / or gas-oxygen. This type of machine is most suitable for laden industrial production such as Bulmac 2005 EOOD. The implementation of this type of machine will increase the productivity and competitiveness of the company thanks to the positioning accuracy, repeatability and cutting quality of the machine.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 07 Mar, 2019
End date 06 Apr, 2020
Contract date 07 Mar, 2019
View in UMIS

Beneficiary

Financial information

Total cost 389,510.17
Grant 327,188.54
Self finance 62,321.63
Total paid 327,166.56
EU participation percent 85.0%