„Improvement of technological capabilities and production capacity in „MILEN TZOKOV" Ltd."

The present project will be realized by the company "MILEN TZOKOV" Ltd. - Pleven, specialized in the production of polyethylene heat shrink film, polyethylene bags, roof foils, sacks and envelopes for the sewing industry. According to the National Classification of Economic Activities (NACE.BG - 2008), the activity is classified with code 22.22 "Production of plastic packaging". The production activity of the company is carried out in its own base with an area of ​​980 square meters, located on a plot of 1,800 square meters. The main challenge facing the company is insufficient production capacity (despite the full load of available equipment) to meet the ever-increasing demand. Insufficient capacity makes it impossible to take large orders and execute them for short periods, thus hindering the development of the company. Through the implementation of this project, the existing equipment will be complemented with new, modern and high-performance machines: Machine for production of garbage bags - 1 pc. and flexo printing machine - 1 pc. The implementation of the machines in the production process will lead to: 1. Increase in production capacity and production capacity of 249 tons of plastic packaging at the end of the period considered in the business plan. 2. Increasing the export potential of "MILEN TZOKOV" EOOD. It is planned that, at the end of the forecast period, more than 7 tonnes of manufactured products will be realized on the external markets; 3. Increasing Productivity; 4. Increase in net sales revenue; Within the framework of the project activities are foreseen for the selection of a supplier (in accordance with the procedure described in the Guidelines for the Implementation of OPIC Contracts 2014-2020, ZUESEF and CMD No. 160 / 01.07.2016), delivery, installation and putting into operation of equipment. The total value of the investment is BGN 395 077.66 excluding VAT. The planned duration of the project is 12 months.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 15 Dec, 2020
End date 15 Dec, 2021
Contract date 15 Dec, 2020
View in UMIS

Financial information

Total cost 395,077.66
Grant 276,554.36
Self finance 118,523.30
Total paid 0.00
EU participation percent 85.0%

Location