This project proposal envisages replacement of the existing technological equipment has been purchased following new equipment with higher technological capabilities: - Technological line for the production of elliptical bottoms (Measure 1); - Ventilation system with a heat recovery unit (Measure 2); - Monitoring System products (Measure 3). After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expand production and to lower energy consumption per unit of output. Beneficiary provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting consumption of energy resources and thus - environmental protection, and continuously measuring and analyzing energy efficiency. The project will be a turnaround 18 months and a total value 559 250.00 lev, VAT excluded.
Overview
Status | Closed (completion date) |
---|---|
Start date | 15 Nov, 2017 |
End date | 04 Apr, 2019 |
Contract date | 15 Nov, 2017 |
Programme
Beneficiary
Financial information
Total cost | 559,250.00 |
---|---|
Grant | 391,166.00 |
Self finance | 168,084.00 |
Total paid | 388,400.43 |
EU participation percent | 85.0% |
Location