"Improving the energy efficiency of in Injeneringova kompania Siti Gaz"

This project proposal envisages replacement of the existing technological equipment has been purchased following new equipment with higher technological capabilities: - Technological line for the production of elliptical bottoms (Measure 1); - Ventilation system with a heat recovery unit (Measure 2); - Monitoring System products (Measure 3). After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expand production and to lower energy consumption per unit of output. Beneficiary provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting consumption of energy resources and thus - environmental protection, and continuously measuring and analyzing energy efficiency. The project will be a turnaround 18 months and a total value 559 250.00 lev, VAT excluded.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 15 Nov, 2017
End date 04 Apr, 2019
Contract date 15 Nov, 2017
View in UMIS

Financial information

Total cost 559,250.00
Grant 391,166.00
Self finance 168,084.00
Total paid 388,400.43
EU participation percent 85.0%

Location