Investment to improve energy efficiency in ET "Yoni DM - Y. Stoilov"

In this project will be optimized production in Yoni DM - Yonko Stoilov by purchasing a factory-new hydraulic excavator (Measure 1from the Energy Audit), a factory-new wheel excavator (Measure 2 from the Energy Audit), a new factory Backhoe - loader (Measure 3 from the Energy Audit), reduce energy costs in manufacturing facilities through the purchase of new, energy saving mechanical ventilation system to recover residual heat (Measure 4 from the Energy Audit), reduce energy costs by introducing automated systems for monitoring energy consumption (Measure 5 from the Energy Audit). After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expand production as well as lower energy consumption per unit of output. Beneficiary provides the project to introduce a system of energy management / energy management / and certification under BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting consumption of energy resources and thus - environmental protection, and continuously measuring and analyzing energy efficiency. The project will be a turnaround 18 months and a total value 512 919.82 leva without VAT.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 21 Aug, 2017
End date 27 Sep, 2018
Contract date 21 Aug, 2017
View in UMIS

Financial information

Total cost 509,008.16
Grant 363,885.70
Self finance 145,122.46
Total paid 363,409.43
EU participation percent 85.0%

Location