Energy saving measures in "KOEV - SD" OOD

This project proposal envisages replacement of the existing technological equipment being purchased described below new equipment with higher technological capabilities: - Front loader (Measure 1); - Wheeled mini wheel loader (Measure 2); - Ventilation system with recuperative unit (Measure 3); - A system for monitoring energy consumption of Measure 1 - Front loader (Measure 4). After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expand production and to lower energy consumption per unit of output. Beneficiary provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting consumption of energy resources and thus - environmental protection, and continuously measuring and analyzing energy efficiency. The project will be a turnaround 18 months and a total value 561 761.00 lev, VAT excluded.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 15 Nov, 2017
End date 21 Dec, 2018
Contract date 15 Nov, 2017
View in UMIS

Beneficiary

Financial information

Total cost 561,761.00
Grant 391,166.00
Self finance 170,595.00
Total paid 382,021.74
EU participation percent 85.0%

Location