Through a system of measures to increase the efficiency of energy consumption "DELTA MEBEL GROUP" LTD can reduce consumption, energy costs and greenhouse and harmful gases in the air. This project involves replacing part of existing technological equipment being purchased and put into operation with the following new equipment which will be with higher technological capabilities: - Replacement of an old production line of doors with new automated line, higher performance and lower power consumption (measure 1 of Energy Audit); - Ventilation with recuperation to heat recovery (measure 2 of Energy Audit); - Reduce of energy costs by introducing an automated system for monitoring energy consumption (MEC) (Measure 3 of Energy audit). Replacement of the old production line with a new one is necessary because the current is with high amortization, low productivity and high energy consumption. After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expansion of the enterprise, as well as lower energy consumption per unit of output.
Overview
Status | Closed (completion date) |
---|---|
Start date | 09 Aug, 2017 |
End date | 22 Jan, 2019 |
Contract date | 09 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 553,320.00 |
---|---|
Grant | 391,166.00 |
Self finance | 162,154.00 |
Total paid | 390,710.91 |
EU participation percent | 85.0% |
Location