The investment project envisages integration of new technological equipment being purchased described below new equipment with higher technological capabilities, integrated system for heat recovery system for monitoring energy consumption: - Line for forging pallets (Measure 1 Energy Audit); - Gazokari (Measure 2 by the Energy Audit); - Ventilation system for recovery of residual heat (Measure 3 from the Energy Audit); - Monitoring System products (Measure 4 by the Energy Audit). After integrating the above mentioned technological equipment , the production capacity of the enterprise will grow significantly. With the new equipment the cost of energy per unit of output will be significantly smaller than such old equipment and also production will be significantly more energy efficient and energy saving and on this basis will ensure a significant reduction of emissions CO2.
Overview
Status | Closed (completion date) |
---|---|
Start date | 15 Nov, 2017 |
End date | 29 Nov, 2018 |
Contract date | 15 Nov, 2017 |
Programme
Beneficiary
Financial information
Total cost | 454,177.69 |
---|---|
Grant | 325,504.38 |
Self finance | 128,673.31 |
Total paid | 324,809.88 |
EU participation percent | 85.0% |
Location