Introduction of measures for better energy efficiency "ENERDZHI" Ltd.

The investment project envisages integration of new technological equipment being purchased described below new equipment with higher technological capabilities, integrated system for heat recovery system for monitoring energy consumption: - Line for forging pallets (Measure 1 Energy Audit); - Gazokari (Measure 2 by the Energy Audit); - Ventilation system for recovery of residual heat (Measure 3 from the Energy Audit); - Monitoring System products (Measure 4 by the Energy Audit). After integrating the above mentioned technological equipment , the production capacity of the enterprise will grow significantly. With the new equipment the cost of energy per unit of output will be significantly smaller than such old equipment and also production will be significantly more energy efficient and energy saving and on this basis will ensure a significant reduction of emissions CO2.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 15 Nov, 2017
End date 29 Nov, 2018
Contract date 15 Nov, 2017
View in UMIS

Beneficiary

Financial information

Total cost 454,177.69
Grant 325,504.38
Self finance 128,673.31
Total paid 324,809.88
EU participation percent 85.0%

Location