In this project will be optimized manufacturing activity in "Central repair base 2001 'Ltd. through the purchase of a new mobile concrete center, construction of high efficiency energy-saving mechanical ventilation system to recover the residual heat in the manufacturing facilities, reducing energy costs through the introduction of an automated system for monitoring energy consumption: • Mobile concrete center - 1 (Measure 1 of the Energy Audit) • A system for monitoring energy consumption (CME) (Measure 2 by the Energy Audit); • ventilation with heat recovery to heat recovery (Measure 3 from the Energy Audit); After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expansion of the enterprise, as well as lower energy consumption per unit of production.
Overview
Status | Closed (completion date) |
---|---|
Start date | 21 Aug, 2017 |
End date | 18 Oct, 2018 |
Contract date | 21 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 487,103.00 |
---|---|
Grant | 348,552.10 |
Self finance | 138,550.90 |
Total paid | 348,203.82 |
EU participation percent | 85.0% |
Location