In this project will be optimized production in ET "Zenit-Christo Christozov" by buying high-tech production line for windows and curtain walls (measure 1 Energy Audit), which will consist of: 1. Automatic two-headed cutter machine for cutting aluminum with two heads and servomotor drive 2. Machine processing of aluminum profiles for curtain walls; 3. Automatic table etalbond. Reduce energy costs in manufacturing facilities through the purchase of new, energy saving mechanical ventilation system to recover residual heat (Measure 2 from the Energy Audit), reduce energy costs by introducing automated systems for monitoring energy consumption (Measure 3 from the Energy Audit). After integrating the listed technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expansion of the enterprise, as well as lower energy consumption.
Overview
Status | Closed (completion date) |
---|---|
Start date | 20 Dec, 2019 |
End date | 09 Mar, 2021 |
Contract date | 20 Dec, 2019 |
Programme
Beneficiary
Financial information
Total cost | 558,075.00 |
---|---|
Grant | 391,166.00 |
Self finance | 166,909.00 |
Total paid | 390,544.93 |
EU participation percent | 85.0% |
Location