Increasing energy efficiency in ET "Zenit-Hristo Hristozov"

In this project will be optimized production in ET "Zenit-Christo Christozov" by buying high-tech production line for windows and curtain walls (measure 1 Energy Audit), which will consist of: 1. Automatic two-headed cutter machine for cutting aluminum with two heads and servomotor drive 2. Machine processing of aluminum profiles for curtain walls; 3. Automatic table etalbond. Reduce energy costs in manufacturing facilities through the purchase of new, energy saving mechanical ventilation system to recover residual heat (Measure 2 from the Energy Audit), reduce energy costs by introducing automated systems for monitoring energy consumption (Measure 3 from the Energy Audit). After integrating the listed technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expansion of the enterprise, as well as lower energy consumption.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 20 Dec, 2019
End date 09 Mar, 2021
Contract date 20 Dec, 2019
View in UMIS

Financial information

Total cost 558,075.00
Grant 391,166.00
Self finance 166,909.00
Total paid 390,544.93
EU participation percent 85.0%

Location