Increasing energy and resource efficiency "Strimo - 2012" Ltd. through the purchase of new energy efficient equipment

This project proposal envisages purchasing new: Backhoe loader (Measure 1) wheel excavator (Measure 2), mechanical ventilation system in a production building for recovery of residual heat (Measure 3), and systems for monitoring the energy consumption of Measure 2 - wheel excavator (Measure 4). The new equipment has a higher performance and lower energy consumption per unit of output. Provided for the purchase Backhoe loader has a capacity of 81 kW and maximum capacity of the loader bucket - 1.3 cubic meters Wheel excavator has a bucket capacity of 1.25 cubic meters and power of the diesel engine 102 kW. The project envisages the purchase of mechanical ventilation system in the production facility for recovery of residual heat, which comprises: 1) forced suction unit with recuperator, el. Heating kit with two fans and filters, and 2) ducts and ventilation grills. Fan power is 0,60 kW, but of power. Heater is 9 kW. The expected recuperation efficiency is 73%. The system for monitoring energy consumption of the backhoe loader consists of: 1) energy management software, and 2) gauge efficiency of construction machinery (measurement of fuel consumption, movement of the machine and number of strokes). New technological equipment is high-end with low fuel consumption, which in turn will lead to increased savings CO2 emissions into the atmosphere. Beneficiary provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting the consumption of energy resources and thus - protection environment. The project will be a turnaround 18 months and a total value 523 606.62 BGN, VAT excluded.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 15 Nov, 2017
End date 29 Nov, 2018
Contract date 15 Nov, 2017
View in UMIS

Financial information

Total cost 523,606.62
Grant 374,104.64
Self finance 149,501.98
Total paid 373,710.99
EU participation percent 85.0%