Increasing energy efficiency and reduction of CO2 emissions of "Skat Oil" Ltd through the purchase of a new punching machine

Through the measure for increasing the energy efficiency of "Skat Oil" Ltd., envisaged in the conducted energy audit, the level of energy costs and consumption, as well as harmful emissions, will be significanty reduced. The audit includes the folowing measure: Measure 1 - Replacement of four existing punching machines with a new one with higher productivity and lower energy consumption This measure is necessary not only because it will lead to higher productivity of the enterprise, but especially due to the fact that production will be characterized with a significanty lower level of energy consumption and CO2 emissions.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 21 Aug, 2017
End date 25 Oct, 2018
Contract date 21 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 683,325.00
Grant 485,907.50
Self finance 197,417.50
Total paid 485,487.00
EU participation percent 85.0%