The project proposal provides for optimizing production in ET "Emil Chaoushev - Emfato - Emel Hashimov" by replacing the existing technological equipment, system integration heat recovery system for monitoring energy consumption: • Machines for cutting workshop (Measure 1 of the Energy Audit); • Workshop sewing machines (Measure 2 by the Energy Audit); • Machines for the workshop board (Measure 3 from the Energy Audit); • Ventilation with heat recovery to heat recovery (Measure 4 by the Energy Audit); • A system for monitoring energy consumption (CME) (Measure 5 of the Energy Audit); After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expansion of the enterprise, as well as lower energy consumption per unit of production.
Overview
Status | Closed (completion date) |
---|---|
Start date | 20 Nov, 2017 |
End date | 06 Dec, 2018 |
Contract date | 20 Nov, 2017 |
Programme
Beneficiary
Financial information
Total cost | 558,296.00 |
---|---|
Grant | 391,166.00 |
Self finance | 167,130.00 |
Total paid | 387,888.59 |
EU participation percent | 85.0% |
Location