The project proposal provides for optimization of production activity in "PS GROUP 91" Ltd. through the purchase of new, highly efficient backhoe loader (CTC) system integration heat recovery system for monitoring energy consumption: • Backhoe Loaders (CTC) -3 number (Measure 1 of the Energy Audit); • ventilation with heat recovery to heat recovery (Measure 2 by the Energy Audit); • A system for monitoring energy consumption (CME) (Measure 3 from the Energy Audit); After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expansion of the enterprise, as well as lower energy consumption per unit of production.
Overview
Status | Closed (completion date) |
---|---|
Start date | 09 Aug, 2017 |
End date | 21 Dec, 2018 |
Contract date | 09 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 473,886.00 |
---|---|
Grant | 339,300.20 |
Self finance | 134,585.80 |
Total paid | 338,729.00 |
EU participation percent | 85.0% |
Location