Improving energy efficiency in "PS GROUP 91" Ltd.

The project proposal provides for optimization of production activity in "PS GROUP 91" Ltd. through the purchase of new, highly efficient backhoe loader (CTC) system integration heat recovery system for monitoring energy consumption: • Backhoe Loaders (CTC) -3 number (Measure 1 of the Energy Audit); • ventilation with heat recovery to heat recovery (Measure 2 by the Energy Audit); • A system for monitoring energy consumption (CME) (Measure 3 from the Energy Audit); After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expansion of the enterprise, as well as lower energy consumption per unit of production.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Aug, 2017
End date 21 Dec, 2018
Contract date 09 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 473,886.00
Grant 339,300.20
Self finance 134,585.80
Total paid 338,729.00
EU participation percent 85.0%

Location