"Competitiveness and Sustainable Development Energy Efficiency"

Investments in the project are aimed at increasing the energy efficiency of "ATMIKS CONCRETE" Ltd, which will reduce production costs, greening and enhancing the competitiveness of the enterprise. The project includes activities for implementation of recommended energy report measures to expand the production capacity of an existing business facility for production of concrete solutions and mixes by closing the production cycle - from production of aggregate materials and installation works of concrete, one of the main sources to improve the energy efficiency of the enterprise. Automating the management of thermal and energy facilities contributes to the overall effect of realizing energy savings in the enterprise. Energy efficiency in the production site of "ATMIKS concrete" Ltd. will be achieved by ensuring optimal flow of production and process the required quality with minimum energy consumption. In this context, management of energy costs in a manufacturing enterprise is a key activity in the implementation of comprehensive energy management. Its application leads to a reduction in energy costs in particular proceedings and reduce energy component in the cost of the final product or service, while maintaining its quality and competitiveness. The project will introduce a system for energy management (CEM) under the requirements of ISO 50001: 2011. The expected results of the implementation of the recommended measures in the energy report are expressed in achieving energy savings of 4,035,281 kWh / a. factor and energy savings: 54.44 percent. Contribution to environmental protection is to reduce the emission of CO2 emissions by 1462.01 tons / year. The project has a social purpose - as a result of its implementation will open two new jobs.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Aug, 2017
End date 28 Mar, 2019
Contract date 09 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 3,286,173.38
Grant 1,496,463.01
Self finance 1,789,710.37
Total paid 1,496,160.00
EU participation percent 85.0%

Location