Increasing the energy efficiency of MIGAROV-EL

The company "MIGAROV - EL" Ltd. was founded on 20 January 2006. It grows in the field of innovation and technology. The company works in the field of electro and electrical equipment, the main activities are: • manufacture of electrical equipment and panels; • metal complete transformer substations (MKTP) with chromed metal frame made of high quality Bulgarian and imported materials (aluminum profiles and profile "etalbond"), switchgear minute type TPS, Merlin Gerin and Areva; • equip the substations; • electrical, electrical and commercial activities; • installation of electrical medium voltage 10kV and 20kV, including cables and couplers for them; • Perform complete projects and building installations. MIGAROV-EL builds and maintains power of Borosport in Borovets, manufactures and installs panels for facilities management of Gastrade AD maintains power and builds MKTP the largest center of Sofia France Auto in Sofia, manufactures main distribution boards for Hotel International Golden Sands, building substation with electrical business buildings business Center Europe, bul. Iskar road 7. The company builds and maintains internal and external power of some of the largest construction companies - "Litos amp; Co 'Ltd' MAXI I" JSC, "ADA" Ltd. "Kridi 2002" Ltd, "Borosport" JSC "TTrast Engineering" Ltd, "Dager Engineering" Ltd, "International" JSC, "FLORANS 91" LTD "K amp; K Engineering" Ltd, "UNIVERSIADA" JSC and others. The company has its own well-equipped factory located in gr.Kostinbrod an area of ​​1000m2. Through the project proposal will be purchased one piece hydraulic guillotine with CNC control (Measure 1), a number of ventilation system with a heat recovery unit (Measure 2) and a number of automated system for monitoring energy consumption (Measure 3), which will lead to increasing energy efficiency due to energy savings and reduce CO2 emissions and increase productivity.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Aug, 2017
End date 19 Nov, 2018
Contract date 09 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 412,585.00
Grant 296,389.50
Self finance 116,195.50
Total paid 283,676.25
EU participation percent 85.0%

Location