Increasing energy efficiency "Boshkov-Bild" Ltd.

In this project will be optimized manufacturing activity in "Boshkov-Bild" Ltd. through the purchase of new, highly efficient Crawler Excavator larger Crawler Excavator compact, construction of high efficiency energy-saving mechanical ventilation system to recover the residual heat in the production premises , reducing energy costs by introducing an automated system for monitoring energy consumption: • Crawler Excavator larger number -1 (Measure 1 of the Energy Audit); • Compact tracked excavator - 1 (Measure 2 by the Energy Audit) • ventilation with heat recovery to heat recovery (Measure 3 from the Energy Audit); • A system for monitoring energy consumption (CME) (Measure 4 by the Energy Audit); After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will lead to taking more orders and expansion of the enterprise, as well as lower energy consumption per unit of production.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 15 Nov, 2017
End date 24 Jul, 2019
Contract date 15 Nov, 2017
View in UMIS

Financial information

Total cost 557,950.00
Grant 391,166.00
Self finance 166,784.00
Total paid 391,062.42
EU participation percent 85.0%

Location