The investment project of "ZKI Volta" Ltd., provides for the reduction of energy costs and optimize production activity in the company, buying new equipment with higher technological possibility: 1. El . Calender for automated management (three shaft ) 75kW, 22kW calender and extruder ( Measure 1 Energy Audit) ; 2. Injection molding machine for polyethylene and plastic products, complete with matrix parts with two sockets (Measure 2 by the Energy Audit); 3. Hydraulic press equipped with termostantsiya and 17 molds ( Measure 3 from the Energy Audit) ; 4. Termostantsiya to press ( Measure 4 by the Energy Audit) ; 5. Mill for plastic ( Measure 5 of the Energy Audit) . After integrating the above mentioned technological equipment , production capacity of the "ZKI Volta" Ltd. will increase significantly , which in turn will lead to the uptake and implementation of more orders and expansion of the enterprise, as well as lower power consumption per unit of output . "ZKI Volta" Ltd. provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting the consumption of energy resources and thus - protection the environment, and continuously measuring and analyzing the energy efficiency.
Overview
Status | Closed (completion date) |
---|---|
Start date | 17 Aug, 2017 |
End date | 12 Apr, 2019 |
Contract date | 17 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 1,037,000.00 |
---|---|
Grant | 633,570.00 |
Self finance | 403,430.00 |
Total paid | 633,021.00 |
EU participation percent | 85.0% |
Location