Increasing energy efficiency, optimizing production activity and reduce electricity costs in the "ZKI Volta " Ltd.

The investment project of "ZKI Volta" Ltd., provides for the reduction of energy costs and optimize production activity in the company, buying new equipment with higher technological possibility: 1. El . Calender for automated management (three shaft ) 75kW, 22kW calender and extruder ( Measure 1 Energy Audit) ; 2. Injection molding machine for polyethylene and plastic products, complete with matrix parts with two sockets (Measure 2 by the Energy Audit); 3. Hydraulic press equipped with termostantsiya and 17 molds ( Measure 3 from the Energy Audit) ; 4. Termostantsiya to press ( Measure 4 by the Energy Audit) ; 5. Mill for plastic ( Measure 5 of the Energy Audit) . After integrating the above mentioned technological equipment , production capacity of the "ZKI Volta" Ltd. will increase significantly , which in turn will lead to the uptake and implementation of more orders and expansion of the enterprise, as well as lower power consumption per unit of output . "ZKI Volta" Ltd. provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting the consumption of energy resources and thus - protection the environment, and continuously measuring and analyzing the energy efficiency.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 17 Aug, 2017
End date 12 Apr, 2019
Contract date 17 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 1,037,000.00
Grant 633,570.00
Self finance 403,430.00
Total paid 633,021.00
EU participation percent 85.0%

Location