Increasing the energy efficiency of INERT 94 LTD.

The activity of INERT 94 LTD. is focused in infrastructure construction, plumbing systems, high construction and extraction of inert materials. The Company performs works activities such as: -Construction of water networks, collectors and drainage; -Construction of steel structures; -Masonry; -Construction of structures of gypsum board (drywall) and others. The main stages of production to the technological map are the following: -First stage - Production of crushed - stone fractions for concrete; -Second stage - Building construction; -Third stage - Services heavy machinery. The investment project envisages replacement of the existing technological equipment by purchasing the following new equipment with higher technological capabilities: •Tracked excavator; •Mobile crusher rotor; The items listed above equipment will have higher performance and lower power consumption. After its integration, the production capacity of the enterprise will grow significantly, which in turn will reduce the cost of energy consumption per unit of production.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Aug, 2017
End date 04 Apr, 2019
Contract date 09 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 2,016,759.00
Grant 1,419,311.30
Self finance 597,447.70
Total paid 1,171,534.56
EU participation percent 85.0%

Location