VODNO STROITELSTVO I REMONTI was registered in 2003. Main activity of the company is implementation of construction works on objects of hydro and water development and construction of residential and industrial buildings. The biggest potential of the company is focused in the field of hydro and water construction. Over the years his business the company has built dozens of water supply and sewerage networks, pumping stations and treatment plants and other hydraulic structures. The company participates as a performer of collector and drainage systems in building site "Highway" Maritza "- LOT 2" section Dimitrovgrad. - Town. Harmanli. The project will be purchased crawler hydraulic excavator, backhoe loader, ventilation system in a production building for recovery of residual heat system for monitoring energy consumption of Measure 1 - crawler hydraulic excavator and their commissioning will reduce the consumption of diesel fuel and lead to an expansion of production capacity.
Overview
Status | Closed (completion date) |
---|---|
Start date | 21 Aug, 2017 |
End date | 10 Jun, 2019 |
Contract date | 21 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 539,450.00 |
---|---|
Grant | 385,195.00 |
Self finance | 154,255.00 |
Total paid | 383,913.00 |
EU participation percent | 85.0% |
Location