Increasing energy and resource efficiency "Bulmeks" Ltd. by purchasing new machines

This project proposal envisages replacement of old excavator with a new wheel excavator (Measure 1), replacing the old loader with a new wheel loader (Measure 2) and replacement of the old crushing - screening plant with new crushing - screening plant (Measure 3). The new equipment has a higher performance and lower energy consumption per unit of output. Provided for the purchase wheeled excavator has a maximum power - 129 kW / 173 hp at speed - 2000 rpm. and indicative fuel consumption of 8.1 l / h. in lighter regime to 17.3 l / h. heavy duty. Maximum engine power to the front loader is 220 kW / 300 hp at speed - 1300 rpm. Indicative its fuel consumption is between 8.4 l / h. in lighter regime to 20.8 l / h. heavy duty. Both excavators have systems to improve environmental performance through the processing of exhaust gases (diesel particulate filter) and systems to improve energy efficiency. The new MET will have a total installed capacity of 200 kW, rated power 149,4 kW and will include the following key components: I. cone crusher capacity - 140 t / h and the diameter of the cone head - 700 mm. II. Wash tridekovo sieve screening area of ​​8 square meters III. Hydrocyclone dewatering system, including receiving tub and water pump IV. Strips, structures, hoppers and feeders. The planned purchase installation has a single performance in times of old, which leads to much lower energy consumption per unit of output. Beneficiary provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting the consumption of energy resources and thus - protection environment. The project will be a turnaround 18 months and a total value 2 180 329.00 BGN without VAT.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 21 Aug, 2017
End date 10 Jun, 2019
Contract date 21 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 2,180,329.00
Grant 1,492,061.72
Self finance 688,267.28
Total paid 1,491,791.72
EU participation percent 85.0%