"Sustainable development through energy efficiency and efficiency"

Investments in the project are aimed at increasing the energy efficiency of the enterprise, which will reduce production costs, greening and increase competitiveness. The activities are consistent with the recommendations of the report made after energy audit of industrial system within the enterprise. It is envisaged that the delivery and commissioning of auxiliary assets for the production of pipes and fittings made of fiberglass, diesel forklift, electric stacker, bridge, single girder standing crane with energy network, Radial drilling, hardening furnace equipment for winding elements monitoring system for energy consumption. Will be delivered and put into operation system for utilization of residual heat. The project will be implemented and certified ISO 50001: 2011 Energy Management Systems. Expected results include improved market presence, improving management and production processes, higher productivity, cost reduction and optimization of the production chain and increase the added value. Objectives and expected results are in line with corporate policy that now observed in overall activity as one of the employers in the region. Proof of this is the introduction of an energy management system, which will ensure sustainable development "RIMISAR" LTD. As a result of realization of the project will open two (2) new jobs. Expected results from support under the procedure will be the enhanced competitiveness of the enterprise by improving energy efficiency and capacity, which in turn will lead to more sustainable growth and a reduction in energy intensity at both the production companies and general for the economy.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 21 Aug, 2017
End date 06 Jun, 2019
Contract date 21 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 505,125.14
Grant 363,547.58
Self finance 141,577.56
Total paid 356,737.87
EU participation percent 85.0%

Location